Required Residential Inspections
- FOOTING...........................Continuous keyway
- FOUNDATION.................... After receipt of foundation as-built by building/inspections dept. As-built must be uploaded into your permit application through permiteyes. Tar line should reflect frost protection coverage
- SONOTUBES......................Installed, but prior to concrete placement
- ROUGH WIRING.................Prior to rough frame inspection and passed
- ROUGH PLUMBING...........Prior to rough frame inspection and passed
- ROUGH GAS......................Prior to rough frame inspection and passed
- ROUGH HVAC....................Along with rough frame inspection
- ROUGH FRAME.................Rough wiring, plumbing and gas signed off, and all pre-insulation in place (any component of the insulation process that will be concealed).
- INSULATION......................100% in place in all areas that will be covered by wall board.
- FINAL WIRING
- FINAL PLUMBING
- FINAL GAS
- FINAL BUILDING...............Only after all applicable sign offs are received. Hers Rater Certificate must be uploaded to permiteyes and received by the building / inspections department
- IT IS THE PERMIT HOLDER'S RESPONSIBILITY TO OBTAIN ALL SIGN OFFS APPLICABLE TO THE BUILDING PERMIT. PLEASE DO NOT SCHEDULE A FINAL INSPECTION UNTIL ALL SIGN OFFS ARE RECORDED ON THE BUILDING PERMIT CARD.
- REINSPECTION FEE OF $50.00 MAY BE ASSESSED AS NECESSARY.